Is My Contractor Quote Too High? How to Tell

You can usually tell whether a contractor quote is inflated without knowing the trade, because inflated bids share the same structural tells.

Not sure if your price is fair?

Paste the listing URL or upload the quote and Mazbob scores it from 0 to 100 in seconds.

Break the bid into labor and materials

On most residential work, materials are 30 to 50 percent of the job and labor is the rest. If a bid is 80 percent labor on a materials-heavy job, or the materials line is a single unexplained number, ask for the breakdown. A contractor who will not itemize is either hiding margin or has not measured the job.

JobTypical rangeMaterials share
Interior painting, per sq ft$2 to $615 to 25%
Kitchen remodel, mid-range$25,000 to $60,00050 to 60%
Bathroom remodel$12,000 to $30,00040 to 50%
HVAC system replacement$7,000 to $14,00050 to 60%
Electrical panel upgrade$2,000 to $4,50030 to 40%

Seven red flags

  • One lump sum with no scope, measurements, or materials named.
  • Deposit above 30 percent, or payment demanded before materials are on site.
  • Pressure to sign today for a discount that expires.
  • No license number, no certificate of insurance, no written warranty.
  • Allowances so low the change orders are guaranteed.
  • Cash-only pricing.
  • A bid more than 25 to 30 percent above two other bids for identical scope.

Make bids comparable

Write a one-page scope yourself - dimensions, materials, brands, finish level, timeline, cleanup and disposal - and send the same document to all three contractors. Most bid spread comes from contractors quoting different jobs, not different prices. Then compare unit rates: dollars per square foot, per fixture, per linear foot.

When a high bid is actually fine

A licensed, insured contractor with a two-year workmanship warranty, a realistic schedule, and permits included can legitimately be 15 to 20 percent above the cheapest bid. The problem bid is the one that is higher and vaguer.

Frequently asked questions

How do I know if a contractor is overcharging?
Get three bids on an identical written scope and compare unit rates. A bid more than 25 percent above the other two, with less detail, is usually padded.
What deposit is normal for a contractor?
Ten to 30 percent, or the cost of special-order materials. Many states cap residential deposits by law.
Should I always take the lowest bid?
No. The lowest bid often excludes permits, disposal, or proper materials. Compare scope first, then price.

Before you pay, check Mazbob

Paste a URL, upload a PDF or screenshot, or type the details. You get a Mazbob Score from 0 to 100, a fair value range, potential savings, and a negotiation target.

Related guides

For information only - not financial advice. Prices are typical U.S. ranges and vary by region and condition.